| MultiPlexx Liners are prefabricated to structure size. On-site, structures are pressure-cleaned and grouted where necessary, while steps and obstructions are removed. |
Epoxy-coated liner inserted into manhole interior. |
Flexible diaphragm
is inflated. Heat introduced within the pressurized system
cures the epoxy, forming a protective barrier within the
structure. Curing under pressure gravity greatly enhances
bonding. |
Structures are virtually renewed, sealed from further corrosion and infiltration. Manholes and pump stations, for example, can be completely rehabilitated in 4 to 8 hours, with little or no downtime. |